logo

Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability

Szczegóły Produktu:
Miejsce pochodzenia: Chiny (kontynent)
Nazwa handlowa: YT
Orzecznictwo: ISO9001
Numer modelu: EX750-5
Zapłata:
Minimalne zamówienie: 1PCS
Cena: negotiable
Szczegóły pakowania: Standardowe opakowanie eksportowe
Czas dostawy: 7-30 dni
Zasady płatności: L/C, T/T.
Możliwość Supply: 10000 szt./Miesiąc

Szczegóły informacji

Model nr.: EX750-5 Orzecznictwo: ISO9001
Nazwa produktu: Koło przydałkowe lub Skończyć: Gładki
Głębokość twardości: 8-12 mm Pochodzenie: CHINY
Proces: Kucie/casting Dostępność: 10-15 dni
Podkreślić:

8-12mm Hardness Depth Front Idler Assembly

,

EX750-5 Front Idler Assembly

,

10-15 Days Availability Front Idler Assembly

opis produktu

Hitachi EX750-5 Construction Machinery Bulldozer Heavy Duty Undercarriage Spare Parts Heat Treatment Front Idler Assembly

The Hitachi EX750-5 Front Idler Assembly is engineered for superior durability and performance in heavy-duty construction and mining applications. This precision-manufactured component ensures extended service life and reduced maintenance requirements.

What is an Idler?

The CHT idler combines advanced design with precision manufacturing for exceptional durability and safety. Key features include:

  • Idler-axle keyed joint expands bearing surface and enhances torque transmission
  • Specialized heat treatment achieves HRC48-58 surface hardness with 4-6mm hardened layer
  • Manufactured through alkali phenolic resin sand casting for robust, stable parts
  • Final refinement on CK5110 large-scale precision CNC vertical lathe ensures exact dimensions
  • Extended track life reduces replacement frequency and maintenance safety risks
Idler Characteristics
Tech-Driven Durability: Built to Outlast

50% reduced bearing pressure extends component life by 2x or more. The splined idler-shaft connection ensures reliability while aligning with other undercarriage parts to prevent uneven wear. Heavy-duty rock guard protects against dirt and debris.

Efficiency-Focused Design: Minimize Downtime, Maximize Output

Detachable bushed bearing blocks enable 40% faster maintenance without track disassembly. Dedicated lubricators prevent friction failures, while expanded bearing surfaces boost track stability in rough conditions.

Cost-Smart Engineering: Lower TCO, Higher Returns

Reduces unplanned stoppages and extends track system service life, significantly lowering overall operational costs through decreased downtime and part replacements.

Design/Structure/Main Dimensions of Installation
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 0 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 1 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 2
Production Processes
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 3
Hot Sale Products
Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 4 Hitachi EX750-5 Front Idler Assembly with 8-12mm Hardness Depth and 10-15 Days Availability 5
Our Advantages
  • World-class quality standards
  • Factory-direct pricing
  • 35 years of excavator & bulldozer parts manufacturing experience
  • Fast 30-day delivery after contract
  • Professional sales and logistics support
  • Comprehensive after-sales services including 24/7 technical support

YinTai Parts is a leading Chinese manufacturer of excavator idlers with over 30 years of industry expertise. We guarantee the highest quality and performance for all our undercarriage components.

Skontaktuj się z nami

Wpisz swoją wiadomość

Możesz być w tych