Heavy-Duty Heat-Treated Track Chain & Track Link for Komatsu PC300 Excavator
Podstawowe właściwości
Miejsce pochodzenia:
Chiny (kontynent)
Nazwa marki:
YT
Numer modelu:
PC300
Nieruchomości handlowe
Minimalna ilość zamówienia:
1 szt
Cena:
negotiable
Warunki płatności:
L/C, T/T
Możliwość zaopatrzenia:
10000 szt./miesiąc
Dane techniczne
| Model NO.: | PC300 | Material: | 35MNB |
| Color: | Żółty / czarny / wymagany przez klienta | Condition: | 100% nowy |
| Certification: | ISO9001: 2000 | Related Parts: | Rolka bieżna, rolka napinająca, rolka nośna, koła zębate |
| HS Code: | 84314999 | Type: | Części podwozów |
| High Light: | Heavy-Duty Komatsu PC300 track chain,Heat-treated excavator track link,Komatsu PC300 track link replacement |
||
Opis produktu
Heavy-Duty Heat-Treated Track Chain & Track Link for Komatsu PC300 Excavator
Precision-Engineered Track Link Features for Uninterrupted Performance
Our heavy-duty track links eliminate premature wear, frequent replacements, and costly downtime, delivering reliable performance in demanding mining and construction environments.
We utilize advanced machining centers with horizontal and vertical CNC equipment for high-precision turning, drilling, threading, and milling processes. This manufacturing standard ensures superior component quality, seamless assembly accuracy, extended service life, and reduced hourly production costs.
Our track links are forged from high-grade 35MNB special steel, enhanced with structural reinforcement technology and advanced heat treatment processes. The result provides maximum strength and exceptional abrasion resistance for heavy loads and abrasive terrain. The integrated self-lubricating system reduces friction and wear, extending track chain bearing service life while minimizing maintenance requirements.
Main Installation Dimensions
Main Parameters
| Suitable Model | P | A | B | C | E | F | H | K | L |
|---|---|---|---|---|---|---|---|---|---|
| PC60-6/PC75/SK60 | 154 | 89 | 73 | 57 | 14.5 | 45 | 104 | 74 | 33.5 |
| PC100-1/2/PC100-3/HD350 | 154 | 112.4 | 82.4 | 57 | 14.5 | 49.4 | 124.4 | 87 | 40 |
| EX60-1/2/3/5 | 154 | 90 | 90 | 55 | 14.5 | 56 | 127 | 80 | 38 |
| R200/K907 | 171.45 | 144.5 | 125.4 | 58.7 | 16.5 | 87.7 | 171.7 | 101.6 | 42.8 |
| EX120/R900/E110/E120 | 171.45 | 108 | 108 | 60.3 | 16.5 | 68 | 144.8 | 95 | 44 |
| EX130/SK120/SK100 | 171.45 | 108 | 108 | 60.3 | 16.5 | 58.6 | 129 | 90.2 | 40.7 |
| EX100 | 171.45 | 108 | 108 | 60.3 | 16.5 | 68 | 144.8 | 95 | 44 |
| PC200-5/DH220 | 190 | 160.4 | 124.4 | 62 | 20.5 | 85.6 | 176.4 | 105 | 47 |
| E200B/E320/E240B/SK200 | 190 | 155.6 | 119.6 | 69 | 20.5 | 82.2 | 174.2 | 106 | 46 |
The models above are for reference only. We supply additional products based on your requirements. Please contact us with your specific needs.
Forging and Heat Treatment Process
Hot Sale Products
Our Manufacturing Advantages
- World-class quality standards
- Factory-direct pricing with competitive rates
- Flexible payment terms including T/T and L/C
- Fast delivery within 30 days after contract establishment
- Comprehensive after-sale services including video technical support and 24-hour online assistance
Customer Feedback
YinTai Parts is a professional manufacturer and supplier of excavator track links in China, with over 30 years of industry experience. Our expertise ensures high-quality products with reliable performance for all your heavy equipment needs.
Frequently Asked Questions
Are you a trader or manufacturer?
We are an industry and trade integration business with our factory located in Quanzhou and sales department in Xiamen city center.
Can I get samples for quality checking?
Samples are available free of charge, but customers are responsible for shipping costs.
What are your payment terms?
We typically accept T/T or L/C, though other payment terms can be negotiated.
What is your minimum order quantity?
Minimum order is typically USD5000. We accept both full container loads (20') and less than container load (LCL) shipments.
What is your delivery time?
FOB Xiamen or any Chinese port: 35-45 days. For parts in stock, delivery time is 7-10 days.
How do you handle quality control?
We maintain a comprehensive QC system with dedicated teams monitoring every production process from manufacturing to packaging, ensuring product safety and quality throughout the entire production cycle.